Owner dashboard and Gantt

Run your whole plant from one screen

Live orders, machine load and risks on one screen. Step off the floor without worry.

Live work-in-progress by stageOwner View
Prodman live Work-in-Progress WIP matrix across factory stages
Real screen · Running in production

What this costs while it stays invisible.

  • You walk the floor many times a day just to check key orders.
  • Everything waits on you. The day you leave, work stalls.
  • Packing sits idle because parts were left at an earlier machine.
  • Goods at outside vendors drop out of sight until a client chases.
  • Day-old paper reports mean you hear about breakdowns too late.

What changes when the floor can be trusted.

  • One live screen shows every order by stage, with counts from the floor.
  • A machine Gantt shows next week's load, so you spot overloads early.
  • Stuck orders, scrap spikes and near dispatch dates show up on their own.
  • Goods at outside binders, platers or coaters stay in view.
  • Live markers show floor activity now, so you decide on facts.

How it works

Step by step on the floor.

  1. 1Operators log work on floor tablets
  2. 2Stage counts update in the background
  3. 3The dashboard and Gantt update in seconds
  4. 4Near dispatch dates and scrap spikes are flagged
Machine load GanttPlant Capacity & Gantt
Prodman machine capacity planning and visual Gantt timeline
Real screen · Running in production

Inside the Software

Real application screens. Not concept mockups.

Here is the actual interface your machine minders and plant leadership interact with every day, captured directly from running production setups.

Live work-in-progress by stage
Owner View
Prodman live Work-in-Progress WIP matrix across factory stages

Open orders across stages like Binding, Folding, Plate Making, Gathering and Cutting. Updates within seconds of each scan.

  • Stage counts update live
  • See piles building up before the next station runs dry
  • Numbers come straight from floor scans
Machine load Gantt
Plant Capacity & Gantt
Prodman machine capacity planning and visual Gantt timeline

Machine load across work centres like the 3-Knife Trimmer, CTP Plate Setter and Folding Machines. Shows running, queued and outsourced work.

  • See overloaded lines days ahead
  • Colour-coded: In production, Scheduled, Done, Outsourced
  • Stops delivery promises you cannot keep
Risks and blockers
AI Employees
Prodman AI Employees exception panel showing critical blockers

AI Employees flag stuck jobs, unapproved artwork and low stock before they make you late.

  • Alerts raised by AI Employees, no nagging needed
  • Critical blockers by order (ORD-00015, ORD-00016)
  • Click through to the cause, no floor walk needed
~5s
from a press scan to your screen

Questions you should ask before buying any system.

How often does the dashboard update from the floor?

Within seconds of a scan. Log 5,000 sheets on a press and the count shows at once, no refresh needed.

Can I change machine schedules from the Gantt chart?

Not yet. The Gantt is live but read-only, so nobody upsets the floor mid-shift. Drag-and-drop rescheduling is planned for the next release.

Can I open the dashboard on my phone while traveling?

Yes. It works on any screen with multi-factor login. At an expo or abroad, you still see every machine.

You should not need to spend your life walking the floor to discover the truth.

Bring us one problematic production order, one chronic bottleneck, or one metric nobody trusts. In thirty minutes, we will show you how Prodman restores order and calm, without asking your machine operators to become clerical typists.

Limited on-site implementations each quarter · Configured by hand